Surface Finishes & Coatings
Zinc electroplate, hot-dip galvanizing, zinc-nickel, zinc-flake (Dacromet/Geomet) and PTFE post-treatment, carried with fastener orders.
Ordering coatings as part of the fastener, not after it
A coating is a production step with tolerances, not a packaging option. The families collected here cover zinc electroplating, hot-dip galvanizing, zinc-nickel alloy plating, zinc-flake systems of the Dacromet/Geomet type, and PTFE post-treatment on top of a base coat. Each occupies a different corner of the corrosion-versus-thread-tolerance trade-off: electroplated zinc keeps threads dimensionally tight and suits indoor and lightly corrosive service; hot-dip galvanizing builds a much thicker layer and therefore needs over-sized or overtapped mating threads; zinc-flake systems reach high salt-spray endurance with thin, even layers; and zinc-nichel exists for the galvanic-pairing problems of aluminium contact and for higher continuous temperatures.
The practical inquiry states the base fastener, the target environment and duration (hours of salt spray or the standard the project names), and whether the parts are high-strength, because hydrogen-embrittlement risk narrows which processes are admissible on which classes. Batch size and part geometry matter as well — rack-and-hook plating leaves contact marks that flake coating on bulk parts largely avoids — and assemblies that combine coated bolts with coated nuts should be quoted together so the thread pair is verified after coating, not assumed. We confirm the coating standard, thickness callouts and any test-report requirement as part of the quotation rather than discovering them at inspection.
Quality assurance & delivery terms
Full batch traceability from raw material to finished product. Every shipment leaves with documented inspection results, so what you approve in sampling is what arrives in production.
Certifications
- ISO 9001:2015
- RoHS
- REACH
Documents with every order
- Mill Test Certificate (MTC)
- Dimensional Report
- Salt Spray Test Report
Typical lead times
- Standard samples: 3-5 Days
- Bulk standard parts: 15-25 Days
- Custom OEM parts: 30-45 Days
Manufacturing base
- 5000 m² facility, 8 production lines
- 50-100 employees
- Monthly output 80-120 Tons
Request a Quote
Get factory-direct pricing from the manufacturer.
What to include in your Surface Finishes & Coatings inquiry
- ✓ Identify the base fastener material/grade and substrate condition before coating.
- ✓ Name the coating process and governing specification, with required coating thickness and any post-treatment.
- ✓ Define corrosion acceptance explicitly: test method, exposure duration, and whether white corrosion or red rust is the rejection criterion.
- ✓ State any friction-coefficient, torque-tension, temperature or hydrogen-embrittlement controls relevant to the joint.
- ✓ Factory-direct pricing for your Surface Finishes & Coatings
- ✓ Standard and custom specifications
- ✓ Factory-direct export to buyers in Europe, Asia, the Americas and the Middle East
- ✓ Full fastener family support