Zinc Electroplating

Zinc electroplate for steel fasteners — the workhorse finish at roughly twice the cost of phosphate & oil, 72–384 hours neutral salt spray depending on specification, with post-plate baking for hardened parts to manage hydrogen embrittlement.

Last updated: 2026-11

Request a Quote

Zinc Electroplating in an industrial setting
Illustrative image redrawn from real Zinc Electroplating product references — not a photograph of stocked items.

Specifications

Zinc electroplate is the default corrosion finish on steel fasteners: metallic zinc deposited from a water solution by electric current. The base deposit is gray; chromate passivates make it clear, yellow, or other colors, and thickness classes trade cost for corrosion life — thinner deposits for dry indoor service, thicker for wet or saline exposure. Most fastener zinc callouts are ASTM B633 (the most common single callout in one plating shop's reported mix being Type II SC2 with yellow dichromate — the 8 µm moderate-thickness class). It is an electroplating process, so hardened high-strength parts carry hydrogen-embrittlement risk and are baked after plating; plating specifications spell out the bake procedures, which can run 24 hours or more depending on thickness.

Process Electroplating — cathodic deposition of zinc from ionic solution
Reference standards ASTM B633 (fastener zinc plate) and ASTM F1941 (threaded fastener electroplate); baking per ASTM B850
Common callout ASTM B633 Type II SC2, yellow dichromate — SC2 is the moderate 8 µm (0.0003″) thickness class
Corrosion resistance 72–384 h neutral salt spray by specification — e.g. B633 Type II SC2: 96 h; F1941 FE/ZN 8C: 120 h; GMW3044 clear variants: 72 h and 240 h; Ford S437: 384 h with COF 0.15
Appearance Gray deposit; clear or yellow (and other colors) via chromate/passivate
Lubricity Moderately rough surface, lower lubricity than plain steel; sealers and lubricant topcoats improve friction and corrosion performance
Hydrogen embrittlement Electroplated process — hydrogen risk for hardened high-strength parts; post-plate bake required, up to 24 h+ by thickness (parts above ~39 HRC baked per shop practice)
Relative cost About twice phosphate & oil (reported plating-shop comparison)

Materials

  • Carbon steel fasteners
  • Alloy steel fasteners (baked after plating)
  • Case-hardened fasteners (baked after plating)

Ordering & documentation

Documents

Shipments of Zinc Electroplating are backed by Mill Test Certificate (MTC), Dimensional Report, Salt Spray Test Report on request, with full batch traceability from raw material to finished product. Quality management for Zinc Electroplating orders follows the owner-confirmed compliance list: ISO 9001:2015, RoHS, REACH. Exact document sets are confirmed on the order.

Quotation

  • The product family (Zinc Electroplating), product standard/designation and drawing or part number.
  • The dimensions that apply to this part — such as size, pitch, length, thickness, fit, grip or groove geometry.
  • Material/grade, heat-treatment condition and surface finish, together with the service environment.
  • Quantity per size, delivery destination and required test or traceability documents.

Sample & supply

Minimum order quantity for zinc electroplating is per batch, carried with the fastener order (applies to the standard sizes and finishes for zinc electroplating; mixed, special or custom variants are quoted — final commercial terms per quotation) Finishing for zinc electroplating run adds 5–10 days to the fastener lead time. Quantities or variants of zinc electroplating outside the standard range are confirmed at quotation.

Storage & shipping

Coated parts are packed for export and shipped factory-direct to buyers in Europe, Asia, the Americas and the Middle East. Store finished fasteners dry and protected until installation, and keep coated parts in their packaging until use; specific packing and preservation requirements can be stated on the order and confirmed at quotation.

Frequently asked questions

When is zinc electroplate the right finish?

For the broad middle of fastener work: indoor and sheltered service, painted assemblies, and outdoor parts whose spec accepts the 72–240 hour salt-spray class of a standard thickness. It costs about twice phosphate & oil but adds real corrosion life, and unlike zinc flake or zinc-nickel it is available everywhere at short lead. Move up when the spec demands more hours than a standard zinc class delivers, or when hardened high-strength parts make the bake requirement unwelcome — that is zinc flake territory.

What is the MOQ and lead time for this finish?

Finishing runs per batch carried with the fastener order and adds 5–10 days to the fastener lead time. Coated parts follow the finish line that processes them, so confirm the exact schedule against quantity and finish class at quotation.

What should an RFQ for this finish state?

State the base fastener (grade, diameter, length), the coating standard and class (or the process plus thickness/color requirement where no standard callout exists), any salt-spray or friction requirement, and quantity per size — plus destination country and required documents such as a mill test certificate.

Request a Quote

Get factory-direct pricing from the manufacturer.

What to include in your Zinc Electroplating inquiry

  • ✓ Identify the base fastener material/grade and substrate condition before coating.
  • ✓ Name the coating process and governing specification, with required coating thickness and any post-treatment.
  • ✓ Define corrosion acceptance explicitly: test method, exposure duration, and whether white corrosion or red rust is the rejection criterion.
  • ✓ State any friction-coefficient, torque-tension, temperature or hydrogen-embrittlement controls relevant to the joint.
  • ✓ Factory-direct pricing for your Zinc Electroplating
  • ✓ Standard and custom specifications
  • ✓ Factory-direct export to buyers in Europe, Asia, the Americas and the Middle East
  • ✓ Full fastener family support

We use your details only to answer this inquiry — see our Privacy notice for everything the form collects.